沼氣發(fā)電機(jī)組的結(jié)構(gòu)組成
1,沼氣脫硫及穩(wěn)壓、防爆設(shè)備:供發(fā)起機(jī)運(yùn)用的沼氣要先通過脫硫設(shè)備,以削減硫化氫對(duì)發(fā)起機(jī)的腐蝕。沼氣進(jìn)氣管路上設(shè)備穩(wěn)壓設(shè)備,以便于對(duì)流量進(jìn)行調(diào)整,到達(dá)較佳的空燃比。別的,為避免進(jìn)氣管回火,應(yīng)在沼氣總管上安頓防回火與防爆設(shè)備。
1. Methane desulfurization, pressure stabilization and explosion-proof equipment: the biogas for the use of the initiator shall pass through the desulfurization equipment first to reduce the corrosion of hydrogen sulfide on the initiator. A pressure stabilizing device is installed on the biogas intake pipeline to facilitate the adjustment of flow to achieve a better air-fuel ratio. In addition, in order to avoid flashback of the intake pipe, anti-flashback and explosion-proof equipment should be installed on the biogas main pipe.
2,進(jìn)氣調(diào)整體系:在進(jìn)氣總管上,需設(shè)置一套準(zhǔn)確、活絡(luò)的燃?xì)饣旌掀鳎哉{(diào)理空氣和沼氣的混合份額。
2. Air inlet adjustment system: A set of accurate and flexible gas mixer shall be set on the air inlet header to regulate the mixing proportion of air and biogas.
3,發(fā)起機(jī)焚燒體系:沼氣的焚燒速度慢,關(guān)于本來運(yùn)用汽油、柴油已及天然氣的發(fā)起機(jī)的焚燒體系要進(jìn)行必定程度的改造,以進(jìn)步焚燒功率,削減后焚燒表象,延伸工作壽數(shù)。
3. Incineration system of initiators: the incineration speed of biogas is slow. The incineration system of initiators that originally used gasoline, diesel and natural gas should be reformed to a certain extent to improve the incineration power, reduce the post-incineration appearance and extend the working life.
4,調(diào)速體系:若沼氣發(fā)電機(jī)組獨(dú)立工作,即以用電設(shè)備為負(fù)荷進(jìn)行工作,用電設(shè)備的并入和卸載都會(huì)使發(fā)電機(jī)的負(fù)荷發(fā)生動(dòng)搖。為了保證發(fā)電機(jī)組正常工作,沼氣發(fā)起機(jī)上的調(diào)速體系必不可少。
4. Speed regulation system: if the biogas generator unit works independently, that is, it works with the electrical equipment as the load, the incorporation and unloading of the electrical equipment will shake the load of the generator. In order to ensure the normal operation of the generator set, the speed control system on the biogas generator is essential.
5,預(yù)熱運(yùn)用體系:選用預(yù)熱運(yùn)用設(shè)備,對(duì)發(fā)起機(jī)冷卻水和排氣中的熱量進(jìn)行運(yùn)用,進(jìn)步沼氣的動(dòng)力運(yùn)用功率。
5. Preheating application system: Preheating application equipment is selected to apply the heat in the cooling water and exhaust of the starter to improve the power utilization of biogas.
6,并網(wǎng)控制體系:首要包含發(fā)電機(jī)調(diào)壓電路,主動(dòng)準(zhǔn)同期并排控制電路,手動(dòng)并排寬和列控制電路,丈量電路,燃?xì)獍l(fā)起機(jī)及輔佐設(shè)備控制電路等。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.51credits.cn咨詢!
6. Grid-connected control system: mainly including generator voltage regulating circuit, active quasi-synchronous side-by-side control circuit, manual side-by-side width and column control circuit, measuring circuit, gas initiator and auxiliary equipment control circuit, etc. Come to our website for more relevant content http://www.51credits.cn consulting service