99国精免费看,夜夜骑免费视频,日韩一区二区三区小视频,精品久久久久国产观看

歡迎進入濟南濟柴環(huán)能燃氣發(fā)電設備有限公司官網(wǎng)!

常見問題解答

燃氣發(fā)電機組尾氣余熱利用效果

返回 2023.07.24 來源:http://www.51credits.cn 0
目前燃料的能量只有約35%被燃氣發(fā)電機組轉化為電能,約有30%隨廢氣排出,25%被燃氣發(fā)電機組冷卻水帶走,通過機身散發(fā)等其它損失約占10%左右,廢氣和換熱器損失的功率比有用功還多。
At present, only about 35% of the fuel energy is converted into electric energy by the Gas-fired power plant unit, about 30% is discharged with exhaust gas, 25% is taken away by the cooling water of the Gas-fired power plant unit, and other losses such as emission through the fuselage account for about 10%. Waste gas and heat exchanger lose more power than useful work.
在我國,目前占燃氣發(fā)電機組燃料近55%熱值的廢氣和冷卻水余熱資源基本上被白白浪費掉,燃氣發(fā)電機組余熱利用技術的就是來實現(xiàn)將原本白白浪費掉的熱資源充分利用的系統(tǒng)。
In China, waste gas and cooling water waste heat resources, which currently account for nearly 55% of the calorific value of Gas-fired power plant unit fuel, are basically wasted. The waste heat utilization technology of Gas-fired power plant unit is to realize the system of making full use of the waste heat resources.
隨著人民生活質量的提高,制冷和采暖越來越普及,能源消耗越來越大,同時燃氣發(fā)電機組余熱資源目前沒有得到綜合利用,消耗了大量能源。根據(jù)燃氣發(fā)電機組余熱利用現(xiàn)狀,我公司發(fā)揮技術優(yōu)勢,研制開發(fā)了一套燃氣機組煙氣余熱利用配套熱管式余熱鍋爐及熱管換熱器,產(chǎn)生的過熱蒸汽和熱水用于余熱發(fā)電及企業(yè)內(nèi)部冷熱電聯(lián)供。
With the improvement of people's living quality, refrigeration and heating are becoming more and more popular, and energy consumption is increasing. At the same time, the waste heat resources of Gas-fired power plant units are not comprehensively utilized at present, which consumes a lot of energy. According to the current situation of waste heat utilization of Gas-fired power plant units, our company has developed a set of heat pipe type waste heat boiler and heat pipe heat exchanger for waste heat utilization of flue gas of gas-fired power units by giving full play to its technical advantages, and the Superheated steam and hot water generated are used for waste heat power generation and internal combined cooling, heating and power supply of enterprises.
燃氣發(fā)電機組
在燃氣機組發(fā)電的同時,以機組廢氣的熱量為能源,煙氣通過熱管余熱鍋爐及熱管換熱器,加熱介質水,熱管余熱鍋爐產(chǎn)生的過熱蒸汽用于余熱發(fā)電,熱管換熱器產(chǎn)生的熱水通過溴化鋰冷水機組制冷或制熱,系統(tǒng)原理如下圖所示:
At the same time of power generation of gas turbine unit, the heat of unit exhaust gas is taken as the energy source. Flue gas passes through heat pipe waste heat boiler and heat pipe heat exchanger, heating medium water, Superheated steam generated by heat pipe waste heat boiler is used for waste heat power generation, and hot water generated by heat pipe heat exchanger is cooled or heated by Lithium bromide water chiller. The system principle is shown in the following figure:
余熱制冷供暖系統(tǒng)流程圖
Flow diagram of waste heat refrigeration and heating system
綜合利用燃氣發(fā)電機組熱能主要從三個方面著手:即電力供應采暖洗浴等供熱以及夏季空調(diào)制冷。在綜合利用的設計過程中應充分考慮以下幾方面的因素:
Comprehensive utilization of heat energy of Gas-fired power plant units mainly starts from three aspects: power supply, heating and bathing, and air conditioning and refrigeration in summer. In the design process of comprehensive utilization, the following factors should be fully considered:
利用應避免對燃氣發(fā)電機組的性能產(chǎn)生大的影響,即不影響燃氣發(fā)電機組的正常運行及功率輸出;
The utilization shall avoid great influence on the performance of Gas-fired power plant unit, that is, it shall not affect the normal operation and power output of Gas-fired power plant unit;
排氣總管到余熱利用系統(tǒng)之間的距離應盡可能短,同時應充分考慮排氣管的隔熱保溫,減少從燃氣發(fā)電機組排氣出口至熱管余熱鍋爐的熱量損失;
The distance between the exhaust header and the waste heat utilization system shall be as short as possible, and the heat insulation of the exhaust pipe shall be fully considered to reduce the heat loss from the exhaust outlet of the Gas-fired power plant unit to the heat pipe waste heat boiler;
需要考慮燃氣發(fā)電機組負荷變化時給余熱發(fā)電及余熱制冷制熱造成的影響,避免因負荷變化使制冷(或制熱)過量或能力不足;
It is necessary to consider the impact on waste heat power generation and waste heat refrigeration and heating caused by load change of Gas-fired power plant unit to avoid excessive refrigeration (or heating) or insufficient capacity due to load change;
考慮到整個流程控制范圍大項點多操作難度大等因素,整個系統(tǒng)應盡可能實行電氣自動化控制和監(jiān)測;
Considering the large control range, multiple items, and high operational difficulty of the entire process, the entire system should implement electrical automation control and monitoring as much as possible;
整套系統(tǒng)應充分考慮維護操作以及使用的安全性。
The entire system should fully consider the safety of maintenance operations and use.
新聞搜索
濟南濟柴環(huán)能燃氣發(fā)電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

燃氣發(fā)電機組尾氣余熱利用效果

目前燃料的能量只有約35%被燃氣發(fā)電機組轉化為電能,約有30%隨廢氣排出,25%被燃氣發(fā)電機組冷卻水帶走,通過機身散發(fā)等其它損失約占10%左右,廢氣和換熱器損失的功率比有用功還多。
At present, only about 35% of the fuel energy is converted into electric energy by the Gas-fired power plant unit, about 30% is discharged with exhaust gas, 25% is taken away by the cooling water of the Gas-fired power plant unit, and other losses such as emission through the fuselage account for about 10%. Waste gas and heat exchanger lose more power than useful work.
在我國,目前占燃氣發(fā)電機組燃料近55%熱值的廢氣和冷卻水余熱資源基本上被白白浪費掉,燃氣發(fā)電機組余熱利用技術的就是來實現(xiàn)將原本白白浪費掉的熱資源充分利用的系統(tǒng)。
In China, waste gas and cooling water waste heat resources, which currently account for nearly 55% of the calorific value of Gas-fired power plant unit fuel, are basically wasted. The waste heat utilization technology of Gas-fired power plant unit is to realize the system of making full use of the waste heat resources.
隨著人民生活質量的提高,制冷和采暖越來越普及,能源消耗越來越大,同時燃氣發(fā)電機組余熱資源目前沒有得到綜合利用,消耗了大量能源。根據(jù)燃氣發(fā)電機組余熱利用現(xiàn)狀,我公司發(fā)揮技術優(yōu)勢,研制開發(fā)了一套燃氣機組煙氣余熱利用配套熱管式余熱鍋爐及熱管換熱器,產(chǎn)生的過熱蒸汽和熱水用于余熱發(fā)電及企業(yè)內(nèi)部冷熱電聯(lián)供。
With the improvement of people's living quality, refrigeration and heating are becoming more and more popular, and energy consumption is increasing. At the same time, the waste heat resources of Gas-fired power plant units are not comprehensively utilized at present, which consumes a lot of energy. According to the current situation of waste heat utilization of Gas-fired power plant units, our company has developed a set of heat pipe type waste heat boiler and heat pipe heat exchanger for waste heat utilization of flue gas of gas-fired power units by giving full play to its technical advantages, and the Superheated steam and hot water generated are used for waste heat power generation and internal combined cooling, heating and power supply of enterprises.
燃氣發(fā)電機組
在燃氣機組發(fā)電的同時,以機組廢氣的熱量為能源,煙氣通過熱管余熱鍋爐及熱管換熱器,加熱介質水,熱管余熱鍋爐產(chǎn)生的過熱蒸汽用于余熱發(fā)電,熱管換熱器產(chǎn)生的熱水通過溴化鋰冷水機組制冷或制熱,系統(tǒng)原理如下圖所示:
At the same time of power generation of gas turbine unit, the heat of unit exhaust gas is taken as the energy source. Flue gas passes through heat pipe waste heat boiler and heat pipe heat exchanger, heating medium water, Superheated steam generated by heat pipe waste heat boiler is used for waste heat power generation, and hot water generated by heat pipe heat exchanger is cooled or heated by Lithium bromide water chiller. The system principle is shown in the following figure:
余熱制冷供暖系統(tǒng)流程圖
Flow diagram of waste heat refrigeration and heating system
綜合利用燃氣發(fā)電機組熱能主要從三個方面著手:即電力供應采暖洗浴等供熱以及夏季空調(diào)制冷。在綜合利用的設計過程中應充分考慮以下幾方面的因素:
Comprehensive utilization of heat energy of Gas-fired power plant units mainly starts from three aspects: power supply, heating and bathing, and air conditioning and refrigeration in summer. In the design process of comprehensive utilization, the following factors should be fully considered:
利用應避免對燃氣發(fā)電機組的性能產(chǎn)生大的影響,即不影響燃氣發(fā)電機組的正常運行及功率輸出;
The utilization shall avoid great influence on the performance of Gas-fired power plant unit, that is, it shall not affect the normal operation and power output of Gas-fired power plant unit;
排氣總管到余熱利用系統(tǒng)之間的距離應盡可能短,同時應充分考慮排氣管的隔熱保溫,減少從燃氣發(fā)電機組排氣出口至熱管余熱鍋爐的熱量損失;
The distance between the exhaust header and the waste heat utilization system shall be as short as possible, and the heat insulation of the exhaust pipe shall be fully considered to reduce the heat loss from the exhaust outlet of the Gas-fired power plant unit to the heat pipe waste heat boiler;
需要考慮燃氣發(fā)電機組負荷變化時給余熱發(fā)電及余熱制冷制熱造成的影響,避免因負荷變化使制冷(或制熱)過量或能力不足;
It is necessary to consider the impact on waste heat power generation and waste heat refrigeration and heating caused by load change of Gas-fired power plant unit to avoid excessive refrigeration (or heating) or insufficient capacity due to load change;
考慮到整個流程控制范圍大項點多操作難度大等因素,整個系統(tǒng)應盡可能實行電氣自動化控制和監(jiān)測;
Considering the large control range, multiple items, and high operational difficulty of the entire process, the entire system should implement electrical automation control and monitoring as much as possible;
整套系統(tǒng)應充分考慮維護操作以及使用的安全性。
The entire system should fully consider the safety of maintenance operations and use.
亚洲人妻视频| 欧美黄片久久久| 亚洲Ⅴa制服丝袜一区二区三区| jiuse九色| 日韩一级免费| 精品观看久久久久久| 国产流白浆| 玖玖玖玖| 成人无码视频| 精品国产乱久久久| 久久人人播| 无码AⅤ一区二区三区在线观看| 精品久久影院| 国产综合精品一区二区三区| 成人性爱综合网| 6080午夜在线影视| JULIA一区二区中文久久94| 首页无码高清 一区二区三区| 久久亚洲一区| 人人摸人人插| 性色av无码爆乳一区二区| 久久R久久免费视频| 日韩一中文字幕视频| 永久免费AV无码网站性色AV| 欧美一区精二区品视频二区| 欧美6一10sex性hd| 国产精品色哟哟| 亚洲欧美www.| 换着玩人妻hd中文字幕| 伊甸园久久蜜桃| 成人无码一区二区三区网站| 欧美乱码精品一区二区三区卡| 欧美aⅴ| 丁香678熟女| 一本无码精品| 亚洲天堂无码2020| 欧美精品 亚洲一区二区| h片在线免费观看| 国产一区二区三区久久精品| 中文成人无码精品久久久| 中文字幕亚洲一区二区无码精品|