99国精免费看,夜夜骑免费视频,日韩一区二区三区小视频,精品久久久久国产观看

歡迎進(jìn)入濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司官網(wǎng)!

常見(jiàn)問(wèn)題解答

燃?xì)鈨?nèi)燃發(fā)電機(jī)組的特點(diǎn)

返回 2021.12.07 來(lái)源:http://www.51credits.cn 0
燃?xì)鈨?nèi)燃發(fā)電機(jī)組發(fā)電的工作原理是:空氣經(jīng)過(guò)濾清器過(guò)濾,進(jìn)入渦輪增壓器增壓,導(dǎo)入內(nèi)燃機(jī)氣缸內(nèi)的混合器,瓦斯經(jīng)過(guò)壓力調(diào)節(jié)閥也進(jìn)入混合器,兩者混合后,通過(guò)電子點(diǎn)火爆燃做功后,推動(dòng)活塞移動(dòng)和曲軸轉(zhuǎn)動(dòng),產(chǎn)生動(dòng)力,帶動(dòng)發(fā)電機(jī),再由發(fā)電機(jī)將動(dòng)力轉(zhuǎn)換成電能,經(jīng)輸變電裝置輸出。
The working principle of the gas-fired internal combustion generator set is: the air is filtered through the filter, enters the turbocharger for pressurization, and is introduced into the mixer in the cylinder of the internal combustion engine. The gas also enters the mixer through the pressure regulating valve. After the two are mixed, the piston moves and the crankshaft rotates to generate power and drive the generator, Then the power is converted into electric energy by the generator and output through the power transmission and transformation device.
為了保障內(nèi)燃機(jī)和發(fā)電機(jī)兩大主機(jī)的正常運(yùn)行,必須配備燃?xì)鈨?chǔ)存、加壓和處理系統(tǒng)、循環(huán)冷卻系統(tǒng)、潤(rùn)滑油系統(tǒng)、電氣系統(tǒng)、控制系統(tǒng)等輔助系統(tǒng)。
In order to ensure the normal operation of internal combustion engine and generator, auxiliary systems such as gas storage, pressurization and treatment system, circulating cooling system, lubricating oil system, electrical system and control system must be equipped.
由于內(nèi)燃機(jī)氣缸內(nèi)的核心區(qū)域工作溫度可以達(dá)到1400℃,使其效率大大超過(guò)了蒸汽輪機(jī),甚至燃?xì)廨啓C(jī)。燃?xì)鈨?nèi)燃機(jī)zui突出的優(yōu)點(diǎn)正是發(fā)電效率比較高,其次是設(shè)備集成度高,安裝快捷,對(duì)于氣體中的粉塵要求不高,基本不需要水,設(shè)備的單位千瓦造價(jià)也比較低。
燃?xì)獍l(fā)電機(jī)組
Because the working temperature of the core area in the cylinder of internal combustion engine can reach 1400 ℃, its efficiency is much higher than that of steam turbine or even gas turbine. The gas-fired internal combustion engine Zui has the outstanding advantages of high power generation efficiency, high equipment integration, fast installation, low requirements for dust in the gas, basically no water, and low cost per kilowatt of equipment.
余熱發(fā)電機(jī)組的工作原理是:燃?xì)鈨?nèi)燃機(jī)做功后的尾氣導(dǎo)入余熱鍋爐,回收熱量,產(chǎn)生過(guò)熱蒸汽,推動(dòng)汽輪機(jī)組發(fā)電,實(shí)現(xiàn)燃?xì)庹羝?lián)合循環(huán)發(fā)電。
The working principle of the waste heat generator unit is: the tail gas after the work of the gas internal combustion engine is introduced into the waste heat boiler to recover heat, generate superheated steam, promote the power generation of the steam turbine unit and realize the gas steam combined cycle power generation.
由于燃?xì)獍l(fā)動(dòng)機(jī)單機(jī)功率小,需要多臺(tái)燃?xì)獍l(fā)動(dòng)機(jī)的尾氣通過(guò)母管集合輸向一臺(tái)余熱鍋爐,多臺(tái)余熱鍋爐的蒸汽通過(guò)蒸汽母管輸入一臺(tái)蒸汽輪機(jī)
Due to the small power of single gas engine, the tail gas of multiple gas engines needs to be transmitted to one waste heat boiler through the main pipe, and the steam of multiple waste heat boilers is input to one steam turbine through the steam main pipe
以上的精彩內(nèi)容就是小編今天為您提供的內(nèi)容,更多的精彩內(nèi)容來(lái)自:燃?xì)獍l(fā)電機(jī)組詳情請(qǐng)點(diǎn)擊我們的網(wǎng)站關(guān)注:http://www.51credits.cn
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from: for details of gas generator set, please click our website to pay attention to: http://www.51credits.cn
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

燃?xì)鈨?nèi)燃發(fā)電機(jī)組的特點(diǎn)

燃?xì)鈨?nèi)燃發(fā)電機(jī)組發(fā)電的工作原理是:空氣經(jīng)過(guò)濾清器過(guò)濾,進(jìn)入渦輪增壓器增壓,導(dǎo)入內(nèi)燃機(jī)氣缸內(nèi)的混合器,瓦斯經(jīng)過(guò)壓力調(diào)節(jié)閥也進(jìn)入混合器,兩者混合后,通過(guò)電子點(diǎn)火爆燃做功后,推動(dòng)活塞移動(dòng)和曲軸轉(zhuǎn)動(dòng),產(chǎn)生動(dòng)力,帶動(dòng)發(fā)電機(jī),再由發(fā)電機(jī)將動(dòng)力轉(zhuǎn)換成電能,經(jīng)輸變電裝置輸出。
The working principle of the gas-fired internal combustion generator set is: the air is filtered through the filter, enters the turbocharger for pressurization, and is introduced into the mixer in the cylinder of the internal combustion engine. The gas also enters the mixer through the pressure regulating valve. After the two are mixed, the piston moves and the crankshaft rotates to generate power and drive the generator, Then the power is converted into electric energy by the generator and output through the power transmission and transformation device.
為了保障內(nèi)燃機(jī)和發(fā)電機(jī)兩大主機(jī)的正常運(yùn)行,必須配備燃?xì)鈨?chǔ)存、加壓和處理系統(tǒng)、循環(huán)冷卻系統(tǒng)、潤(rùn)滑油系統(tǒng)、電氣系統(tǒng)、控制系統(tǒng)等輔助系統(tǒng)。
In order to ensure the normal operation of internal combustion engine and generator, auxiliary systems such as gas storage, pressurization and treatment system, circulating cooling system, lubricating oil system, electrical system and control system must be equipped.
由于內(nèi)燃機(jī)氣缸內(nèi)的核心區(qū)域工作溫度可以達(dá)到1400℃,使其效率大大超過(guò)了蒸汽輪機(jī),甚至燃?xì)廨啓C(jī)。燃?xì)鈨?nèi)燃機(jī)zui突出的優(yōu)點(diǎn)正是發(fā)電效率比較高,其次是設(shè)備集成度高,安裝快捷,對(duì)于氣體中的粉塵要求不高,基本不需要水,設(shè)備的單位千瓦造價(jià)也比較低。
燃?xì)獍l(fā)電機(jī)組
Because the working temperature of the core area in the cylinder of internal combustion engine can reach 1400 ℃, its efficiency is much higher than that of steam turbine or even gas turbine. The gas-fired internal combustion engine Zui has the outstanding advantages of high power generation efficiency, high equipment integration, fast installation, low requirements for dust in the gas, basically no water, and low cost per kilowatt of equipment.
余熱發(fā)電機(jī)組的工作原理是:燃?xì)鈨?nèi)燃機(jī)做功后的尾氣導(dǎo)入余熱鍋爐,回收熱量,產(chǎn)生過(guò)熱蒸汽,推動(dòng)汽輪機(jī)組發(fā)電,實(shí)現(xiàn)燃?xì)庹羝?lián)合循環(huán)發(fā)電。
The working principle of the waste heat generator unit is: the tail gas after the work of the gas internal combustion engine is introduced into the waste heat boiler to recover heat, generate superheated steam, promote the power generation of the steam turbine unit and realize the gas steam combined cycle power generation.
由于燃?xì)獍l(fā)動(dòng)機(jī)單機(jī)功率小,需要多臺(tái)燃?xì)獍l(fā)動(dòng)機(jī)的尾氣通過(guò)母管集合輸向一臺(tái)余熱鍋爐,多臺(tái)余熱鍋爐的蒸汽通過(guò)蒸汽母管輸入一臺(tái)蒸汽輪機(jī)
Due to the small power of single gas engine, the tail gas of multiple gas engines needs to be transmitted to one waste heat boiler through the main pipe, and the steam of multiple waste heat boilers is input to one steam turbine through the steam main pipe
以上的精彩內(nèi)容就是小編今天為您提供的內(nèi)容,更多的精彩內(nèi)容來(lái)自:燃?xì)獍l(fā)電機(jī)組詳情請(qǐng)點(diǎn)擊我們的網(wǎng)站關(guān)注:http://www.51credits.cn
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from: for details of gas generator set, please click our website to pay attention to: http://www.51credits.cn