燃?xì)獍l(fā)電機(jī)組出廠前試驗(yàn)過程大家了解嗎

返回 2020.05.25 來(lái)源:http://www.51credits.cn 0
  我公司生產(chǎn)的每臺(tái)燃?xì)獍l(fā)電機(jī)組出廠前必須經(jīng)過嚴(yán)格的檢驗(yàn)合格后方可出廠。我公司燃?xì)獍l(fā)電機(jī)組的響應(yīng)過程如下:
  Each gas generator set produced by our company must pass strict inspection before leaving the factory. The response process of gas generator unit of our company is as follows:
  首先,將燃?xì)獍l(fā)電機(jī)組按具體生產(chǎn)要求進(jìn)行封裝,并準(zhǔn)備在試驗(yàn)臺(tái)上進(jìn)行試驗(yàn)。
  Firstly, the gas generator set is packaged according to the specific production requirements, and is ready to be tested on the test bench.
  1.將試驗(yàn)燃?xì)獍l(fā)電機(jī)組注滿冷卻液和足夠的潤(rùn)滑油,連接載重線電纜,安裝排煙管,連接啟動(dòng)電池;
  1. Fill the test gas generator unit with coolant and enough lubricating oil, connect the load line cable, install the smoke exhaust pipe and connect the starting battery;
燃?xì)獍l(fā)電機(jī)組
  2.初步觀察燃?xì)獍l(fā)電機(jī)組的安裝是否到位或安裝錯(cuò)誤,是否有漏油或漏水現(xiàn)象,并對(duì)發(fā)電機(jī)的耐壓試驗(yàn)、匝間試驗(yàn)等各項(xiàng)指標(biāo)進(jìn)行試驗(yàn)。有不合格項(xiàng)及時(shí)修改處理的;
  2. Preliminarily observe whether the installation of gas generator unit is in place or wrong, whether there is oil leakage or water leakage, and test the voltage withstand test, turn to turn test and other indicators of the generator. Any unqualified item shall be modified and handled in time;
  3.機(jī)組啟動(dòng)成功后,空轉(zhuǎn)2-3分鐘,觀察是否有異常情況,確認(rèn)沒有上升到高速1500rpm的異常情況。觀察各種測(cè)試數(shù)據(jù)。頻率為50HZ時(shí),電壓為400V,油壓不低于硅發(fā)電機(jī)的油壓。直到水溫上升到60℃,開關(guān)已準(zhǔn)備好進(jìn)行負(fù)荷試驗(yàn)時(shí),機(jī)組一切正常。
  3. After the unit is started successfully, idle for 2-3 minutes, observe whether there is any abnormal condition, and confirm that there is no abnormal condition rising to high speed 1500rpm. Observe various test data. When the frequency is 50Hz, the voltage is 400V, and the oil pressure is not lower than that of the silicon generator. Until the water temperature rises to 60 ℃, when the switch is ready for load test, the unit is normal.
  4.根據(jù)燃?xì)獍l(fā)電機(jī)組的額定功率的大小分別隨著負(fù)載測(cè)試,25%,50%,100%負(fù)荷階段,如果每個(gè)荷載階段在50 hz頻率負(fù)載測(cè)試后,電壓在380 v - 420 v電源的功率因數(shù)乘以當(dāng)前理論的系數(shù)條件下的數(shù)據(jù)符合負(fù)載電流閱讀作為一個(gè)合格的單位功率;觀察發(fā)動(dòng)機(jī)在運(yùn)行過程中振動(dòng)和煙霧顏色的變化;根據(jù)發(fā)動(dòng)機(jī)的標(biāo)準(zhǔn),判斷沒有故障;
  4. According to the rated power of the gas generator set, 25%, 50% and 100% load stages are respectively tested with the load. If the power factor of 380 V - 420 V power supply is multiplied by the current theoretical coefficient after the load test at 50 Hz frequency in each load stage, the data conforms to the load current reading as a qualified unit power; Observe the change of vibration and smoke color during the operation of the engine; judge whether there is any fault according to the standard of the engine;
  5.燃?xì)獍l(fā)電機(jī)組試驗(yàn)工作完成后,記錄試驗(yàn)負(fù)荷,記錄試驗(yàn)時(shí)間和試驗(yàn)人員人數(shù),并將機(jī)組備案和記錄,對(duì)獲準(zhǔn)出廠的合格機(jī)組進(jìn)行密封。
  5. After the completion of gas generator unit test, record the test load, test time and number of test personnel, record and record the unit, and seal the qualified unit approved to leave the factory.
  以上是燃?xì)獍l(fā)電機(jī)組廠家小編為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問網(wǎng)站:http://www.51credits.cn
  The above is the relevant content introduced by the small edition of gas generator manufacturers. If you want to know more, please visit the website: http://www.51credits.cn
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

燃?xì)獍l(fā)電機(jī)組出廠前試驗(yàn)過程大家了解嗎

  我公司生產(chǎn)的每臺(tái)燃?xì)獍l(fā)電機(jī)組出廠前必須經(jīng)過嚴(yán)格的檢驗(yàn)合格后方可出廠。我公司燃?xì)獍l(fā)電機(jī)組的響應(yīng)過程如下:
  Each gas generator set produced by our company must pass strict inspection before leaving the factory. The response process of gas generator unit of our company is as follows:
  首先,將燃?xì)獍l(fā)電機(jī)組按具體生產(chǎn)要求進(jìn)行封裝,并準(zhǔn)備在試驗(yàn)臺(tái)上進(jìn)行試驗(yàn)。
  Firstly, the gas generator set is packaged according to the specific production requirements, and is ready to be tested on the test bench.
  1.將試驗(yàn)燃?xì)獍l(fā)電機(jī)組注滿冷卻液和足夠的潤(rùn)滑油,連接載重線電纜,安裝排煙管,連接啟動(dòng)電池;
  1. Fill the test gas generator unit with coolant and enough lubricating oil, connect the load line cable, install the smoke exhaust pipe and connect the starting battery;
燃?xì)獍l(fā)電機(jī)組
  2.初步觀察燃?xì)獍l(fā)電機(jī)組的安裝是否到位或安裝錯(cuò)誤,是否有漏油或漏水現(xiàn)象,并對(duì)發(fā)電機(jī)的耐壓試驗(yàn)、匝間試驗(yàn)等各項(xiàng)指標(biāo)進(jìn)行試驗(yàn)。有不合格項(xiàng)及時(shí)修改處理的;
  2. Preliminarily observe whether the installation of gas generator unit is in place or wrong, whether there is oil leakage or water leakage, and test the voltage withstand test, turn to turn test and other indicators of the generator. Any unqualified item shall be modified and handled in time;
  3.機(jī)組啟動(dòng)成功后,空轉(zhuǎn)2-3分鐘,觀察是否有異常情況,確認(rèn)沒有上升到高速1500rpm的異常情況。觀察各種測(cè)試數(shù)據(jù)。頻率為50HZ時(shí),電壓為400V,油壓不低于硅發(fā)電機(jī)的油壓。直到水溫上升到60℃,開關(guān)已準(zhǔn)備好進(jìn)行負(fù)荷試驗(yàn)時(shí),機(jī)組一切正常。
  3. After the unit is started successfully, idle for 2-3 minutes, observe whether there is any abnormal condition, and confirm that there is no abnormal condition rising to high speed 1500rpm. Observe various test data. When the frequency is 50Hz, the voltage is 400V, and the oil pressure is not lower than that of the silicon generator. Until the water temperature rises to 60 ℃, when the switch is ready for load test, the unit is normal.
  4.根據(jù)燃?xì)獍l(fā)電機(jī)組的額定功率的大小分別隨著負(fù)載測(cè)試,25%,50%,100%負(fù)荷階段,如果每個(gè)荷載階段在50 hz頻率負(fù)載測(cè)試后,電壓在380 v - 420 v電源的功率因數(shù)乘以當(dāng)前理論的系數(shù)條件下的數(shù)據(jù)符合負(fù)載電流閱讀作為一個(gè)合格的單位功率;觀察發(fā)動(dòng)機(jī)在運(yùn)行過程中振動(dòng)和煙霧顏色的變化;根據(jù)發(fā)動(dòng)機(jī)的標(biāo)準(zhǔn),判斷沒有故障;
  4. According to the rated power of the gas generator set, 25%, 50% and 100% load stages are respectively tested with the load. If the power factor of 380 V - 420 V power supply is multiplied by the current theoretical coefficient after the load test at 50 Hz frequency in each load stage, the data conforms to the load current reading as a qualified unit power; Observe the change of vibration and smoke color during the operation of the engine; judge whether there is any fault according to the standard of the engine;
  5.燃?xì)獍l(fā)電機(jī)組試驗(yàn)工作完成后,記錄試驗(yàn)負(fù)荷,記錄試驗(yàn)時(shí)間和試驗(yàn)人員人數(shù),并將機(jī)組備案和記錄,對(duì)獲準(zhǔn)出廠的合格機(jī)組進(jìn)行密封。
  5. After the completion of gas generator unit test, record the test load, test time and number of test personnel, record and record the unit, and seal the qualified unit approved to leave the factory.
  以上是燃?xì)獍l(fā)電機(jī)組廠家小編為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問網(wǎng)站:http://www.51credits.cn
  The above is the relevant content introduced by the small edition of gas generator manufacturers. If you want to know more, please visit the website: http://www.51credits.cn