99国精免费看,夜夜骑免费视频,日韩一区二区三区小视频,精品久久久久国产观看

歡迎進(jìn)入濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司官網(wǎng)!

發(fā)電機(jī)知識(shí)

燃?xì)獍l(fā)電機(jī)組控制系統(tǒng)設(shè)計(jì)要點(diǎn)

返回 2023.01.31 來(lái)源:http://www.51credits.cn 0
燃?xì)饫洹帷㈦姺植际侥茉聪到y(tǒng)的核心設(shè)備包括燃?xì)獍l(fā)電機(jī)組、吸收式冷(熱)水機(jī)組、余熱鍋爐等。燃?xì)獍l(fā)電機(jī)組設(shè)備包括各種水泵、閥門(mén)、冷卻塔、冷卻風(fēng)機(jī)、配電柜等,如何使這些設(shè)備節(jié)能、經(jīng)濟(jì)地運(yùn)行,控制系統(tǒng)是關(guān)鍵,那么,下面一起了解下燃?xì)獍l(fā)電機(jī)組控制系統(tǒng)設(shè)計(jì)要點(diǎn)!
The core equipment of gas cooling, heating and electric distributed energy system includes gas generator unit, absorption cooling (heating) water unit, waste heat boiler, etc. The gas generator unit equipment includes various water pumps, valves, cooling towers, cooling fans, distribution cabinets, etc. The control system is the key to make these equipment operate energy-efficient and economically. Now, let's understand the design points of the gas generator unit control system!
燃?xì)獍l(fā)電機(jī)組在運(yùn)行過(guò)程中產(chǎn)生兩種能量:電能和熱能。在實(shí)際應(yīng)用中,對(duì)電能和熱能的需求是不斷變化的。通過(guò)排煙系統(tǒng)和冷卻水箱將其排放到空氣中。因此,在分布式能源項(xiàng)目中,項(xiàng)目的經(jīng)濟(jì)可行性是一個(gè)重要的方面。必須了解項(xiàng)目的電力需求和熱需求,設(shè)計(jì)發(fā)電機(jī)組經(jīng)濟(jì)的運(yùn)行方案。
The gas generator unit generates two kinds of energy during operation: electric energy and thermal energy. In practical applications, the demand for electric energy and heat energy is constantly changing. It is discharged into the air through the smoke exhaust system and cooling water tank. Therefore, in distributed energy projects, the economic feasibility of the project is an important aspect. It is necessary to understand the power demand and heat demand of the project, and design the economic operation scheme of the generator unit.
燃?xì)獍l(fā)電機(jī)組
當(dāng)市場(chǎng)上電能的經(jīng)濟(jì)性較好時(shí),項(xiàng)目申請(qǐng)將以產(chǎn)生更多電能為主要目標(biāo)進(jìn)行設(shè)計(jì),同時(shí)考慮很大限度地利用余熱。熱能過(guò)剩時(shí)排放到空氣中。在項(xiàng)目設(shè)計(jì)中,將以電來(lái)定熱;當(dāng)熱能在項(xiàng)目應(yīng)用中的經(jīng)濟(jì)性能良好時(shí),項(xiàng)目設(shè)計(jì)將滿足用戶所需的熱能為主要需求。
When the economy of electric energy in the market is good, the project application will be designed with the main goal of generating more electric energy, and the maximum use of waste heat will be considered. The excess heat is discharged into the air. In the project design, heat will be determined by electricity; When the economic performance of thermal energy in the project application is good, the project design will meet the thermal energy required by users as the main demand.
在產(chǎn)生熱能的同時(shí),項(xiàng)目中多余的電能將通過(guò)市電并網(wǎng)的方式輸送至城市電網(wǎng)。這就是火電的設(shè)計(jì)方法。此類項(xiàng)目申請(qǐng)需要與市電力部門(mén)協(xié)調(diào),取得上網(wǎng)許可。在確定是用熱定電還是電定熱后,我們會(huì)根據(jù)需要設(shè)計(jì)合適的控制系統(tǒng)來(lái)控制燃?xì)獍l(fā)電機(jī)組的正常運(yùn)行。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://www.51credits.cn咨詢!
While generating heat energy, the surplus electric energy in the project will be transmitted to the urban power grid through the way of urban power grid connection. This is the design method of thermal power. The application for such projects needs to be coordinated with the municipal power department to obtain the online license. After determining whether to use heat to determine power or electricity to determine heat, we will design appropriate control system to control the normal operation of the gas generator unit according to the needs. Come to our website for more relevant content http://www.51credits.cn consulting service
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

燃?xì)獍l(fā)電機(jī)組控制系統(tǒng)設(shè)計(jì)要點(diǎn)

燃?xì)饫?、熱、電分布式能源系統(tǒng)的核心設(shè)備包括燃?xì)獍l(fā)電機(jī)組、吸收式冷(熱)水機(jī)組、余熱鍋爐等。燃?xì)獍l(fā)電機(jī)組設(shè)備包括各種水泵、閥門(mén)、冷卻塔、冷卻風(fēng)機(jī)、配電柜等,如何使這些設(shè)備節(jié)能、經(jīng)濟(jì)地運(yùn)行,控制系統(tǒng)是關(guān)鍵,那么,下面一起了解下燃?xì)獍l(fā)電機(jī)組控制系統(tǒng)設(shè)計(jì)要點(diǎn)!
The core equipment of gas cooling, heating and electric distributed energy system includes gas generator unit, absorption cooling (heating) water unit, waste heat boiler, etc. The gas generator unit equipment includes various water pumps, valves, cooling towers, cooling fans, distribution cabinets, etc. The control system is the key to make these equipment operate energy-efficient and economically. Now, let's understand the design points of the gas generator unit control system!
燃?xì)獍l(fā)電機(jī)組在運(yùn)行過(guò)程中產(chǎn)生兩種能量:電能和熱能。在實(shí)際應(yīng)用中,對(duì)電能和熱能的需求是不斷變化的。通過(guò)排煙系統(tǒng)和冷卻水箱將其排放到空氣中。因此,在分布式能源項(xiàng)目中,項(xiàng)目的經(jīng)濟(jì)可行性是一個(gè)重要的方面。必須了解項(xiàng)目的電力需求和熱需求,設(shè)計(jì)發(fā)電機(jī)組經(jīng)濟(jì)的運(yùn)行方案。
The gas generator unit generates two kinds of energy during operation: electric energy and thermal energy. In practical applications, the demand for electric energy and heat energy is constantly changing. It is discharged into the air through the smoke exhaust system and cooling water tank. Therefore, in distributed energy projects, the economic feasibility of the project is an important aspect. It is necessary to understand the power demand and heat demand of the project, and design the economic operation scheme of the generator unit.
燃?xì)獍l(fā)電機(jī)組
當(dāng)市場(chǎng)上電能的經(jīng)濟(jì)性較好時(shí),項(xiàng)目申請(qǐng)將以產(chǎn)生更多電能為主要目標(biāo)進(jìn)行設(shè)計(jì),同時(shí)考慮很大限度地利用余熱。熱能過(guò)剩時(shí)排放到空氣中。在項(xiàng)目設(shè)計(jì)中,將以電來(lái)定熱;當(dāng)熱能在項(xiàng)目應(yīng)用中的經(jīng)濟(jì)性能良好時(shí),項(xiàng)目設(shè)計(jì)將滿足用戶所需的熱能為主要需求。
When the economy of electric energy in the market is good, the project application will be designed with the main goal of generating more electric energy, and the maximum use of waste heat will be considered. The excess heat is discharged into the air. In the project design, heat will be determined by electricity; When the economic performance of thermal energy in the project application is good, the project design will meet the thermal energy required by users as the main demand.
在產(chǎn)生熱能的同時(shí),項(xiàng)目中多余的電能將通過(guò)市電并網(wǎng)的方式輸送至城市電網(wǎng)。這就是火電的設(shè)計(jì)方法。此類項(xiàng)目申請(qǐng)需要與市電力部門(mén)協(xié)調(diào),取得上網(wǎng)許可。在確定是用熱定電還是電定熱后,我們會(huì)根據(jù)需要設(shè)計(jì)合適的控制系統(tǒng)來(lái)控制燃?xì)獍l(fā)電機(jī)組的正常運(yùn)行。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://www.51credits.cn咨詢!
While generating heat energy, the surplus electric energy in the project will be transmitted to the urban power grid through the way of urban power grid connection. This is the design method of thermal power. The application for such projects needs to be coordinated with the municipal power department to obtain the online license. After determining whether to use heat to determine power or electricity to determine heat, we will design appropriate control system to control the normal operation of the gas generator unit according to the needs. Come to our website for more relevant content http://www.51credits.cn consulting service
第四色亚洲色图婷婷| 亚洲国产女久久九九免费| 色婷婷久久五月综合成人| 人妖玩人妖ⅹ| 亚洲欧美另类在线图片区| www.波多野| 久久久久无码精品国产电影| 欧美美女视频| 伊人久久大香线蕉无码不卡| 69亚洲精品| 91日韩国产| 大bbw大bbw大bbw888| 泰州市| 一级黄片色试看60分钟| 婷婷五月天色婷婷| 爱看影院| www.亚洲777| 秋霞网址| 色综合啪| 颍上县| 久久综合9| 久久热精品| www.com无码视频| 色欧美成人精品a∨在线观看| AV在线综合无码| 一区二区三区日韩| 日本青青草免费| 亚洲AV日韩AV色欲AV| 囯产精品一区二区三区毛片| 加勒比亚洲一区二区三区四区| 高清视频你懂的| 久久久久久久综合| 人妻17p| 国产精品久久久久久久久久东京| 在线免费视频你懂的二区| [3d全彩h漫]丝袜人妻| 国产亚洲偷| 吕梁市| 黄色九九影院| 中文字幕无码一区二区三区亚洲| 91免费国产|