99国精免费看,夜夜骑免费视频,日韩一区二区三区小视频,精品久久久久国产观看

歡迎進(jìn)入濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司官網(wǎng)!
當(dāng)前位置:首頁 - 新聞中心 - 發(fā)電機(jī)知識

發(fā)電機(jī)知識

燃?xì)廨啓C(jī)與燃?xì)獍l(fā)電機(jī)組的對比

返回 2020.10.09 來源:http://www.51credits.cn 0
燃?xì)鈨?nèi)燃機(jī)的發(fā)電效率通常在30%-40%之間,比較常見的機(jī)型一般可以達(dá)到35%。燃?xì)鈨?nèi)燃機(jī)更突出的優(yōu)點正是發(fā)電效率比較高,其次是設(shè)備集成度高,安裝快捷,對于氣體中的粉塵要求不高,基本不需要水,設(shè)備的單位千瓦造價也比較低。但是內(nèi)燃機(jī)也有一些不足的地方,首先,內(nèi)燃機(jī)燃燒低熱值燃料時,機(jī)組出力明顯下降,一臺燃燒低熱值8000大卡/立方米天然氣燃料的500千瓦級燃?xì)鈨?nèi)燃發(fā)電機(jī)組,在使用低熱值4000大卡/立方米的焦化煤氣時,出力可能下降到350~400kW左右。
The power generation efficiency of gas-fired internal combustion engine is usually between 30% and 40%, and the more common models can reach 35%. The most prominent advantage of gas-fired internal combustion engine is high power generation efficiency, followed by high equipment integration, fast installation, low requirements for dust in gas, basically no water, and the unit kilowatt cost of the equipment is relatively low. However, the internal combustion engine also has some shortcomings. First of all, when the internal combustion engine burns low calorific value fuel, the unit output drops obviously. A 500 kW gas-fired internal combustion generator set burning 8000 kcal / m3 natural gas fuel with low calorific value may drop to 350-400kw when using coking gas with low calorific value of 4000 kcal / m3.
此外,內(nèi)燃機(jī)需要頻繁更換機(jī)油和火花塞,消耗材料比較大,也影響到設(shè)備的可用性和可靠性兩個主要設(shè)備利用指標(biāo),對設(shè)備利用率影響比較大,有時不得不采取增加發(fā)電機(jī)組臺數(shù)的辦法,來消除利用率低的影響。內(nèi)燃機(jī)設(shè)備對焦化煤氣中的水分子含量和硫化氫比較敏感,可能導(dǎo)致硫化氫和水形成硫酸腐蝕問題,需要采取一些必要措施加以克服。
In addition, the internal combustion engine needs to change the engine oil and spark plug frequently, and the consumption of materials is relatively large, which also affects the availability and reliability of the two main equipment utilization indexes, and has a greater impact on the equipment utilization rate. Sometimes, it is necessary to increase the number of generating units to eliminate the impact of low utilization rate. Internal combustion engine equipment is sensitive to water molecular content and hydrogen sulfide in coking gas, which may lead to sulfuric acid corrosion of hydrogen sulfide and water, and some necessary measures should be taken to overcome it.
焦化發(fā)電機(jī)組
燃?xì)廨啓C(jī)比較適用于高含氫低熱值和氣體含雜質(zhì)較多的劣質(zhì)燃料,一些燃?xì)廨啓C(jī)甚至使用原油和高硫渣油燃料。燃?xì)廨啓C(jī)自身的發(fā)電效率不算很高,一般在30%~35%之間,但是產(chǎn)生的廢熱煙氣溫度高達(dá)450~550℃,可以通過余熱鍋爐再次回收熱能轉(zhuǎn)換蒸汽,驅(qū)動蒸汽輪機(jī)再發(fā)一次電,形成燃?xì)廨啓C(jī)--蒸汽輪機(jī)聯(lián)合循環(huán)發(fā)電,發(fā)電效率可以達(dá)到45%~50%,一些大型機(jī)組甚至可以超過55%。
Gas turbine is more suitable for the inferior fuel with high hydrogen content and low calorific value and gas containing more impurities. Some gas turbines even use crude oil and high sulfur residue fuel. The power generation efficiency of gas turbine itself is not very high, generally between 30% and 35%, but the temperature of waste heat flue gas generated is as high as 450 ~ 550 ℃, which can be recycled by waste heat boiler to convert steam, drive steam turbine to generate electricity again, and form gas turbine steam turbine combined cycle power generation. The power generation efficiency can reach 45% ~ 50%, and some large units can even exceed 55% 。
采用燃?xì)廨啓C(jī)的優(yōu)勢相對比較多,首先是設(shè)備的可用性和可靠性都比較高,綜合利用率一般可以保持在90%;其次,對于燃料的適應(yīng)性比較強(qiáng),含硫、含塵高一點問題都不大;再有就是發(fā)電出力一般不會減少,甚至因為燃料進(jìn)氣量增加而有所增加;此外,燃?xì)廨啓C(jī)功率密度大體積小,比較適合再移動,便于轉(zhuǎn)移運行現(xiàn)場,這對于存在一些不確定性的焦化廠項目的焦化煤氣利用非常有利。但是,世上的事務(wù)有一利,必有一弊,沒有十全十美的事情。
The advantages of using gas turbine are relatively more. Firstly, the availability and reliability of the equipment are relatively high, and the comprehensive utilization rate can generally be maintained at 90%; secondly, the adaptability of fuel is relatively strong, and the problems of high sulfur content and dust content are not obvious; thirdly, the power generation output will not decrease in general, even increased due to the increase of fuel intake; In addition, the gas turbine has large power density and small volume, which is suitable for re moving and easy to transfer the operation site, which is very beneficial to the utilization of coking gas in coking plant projects with some uncertainties. However, the affairs of the world have one advantage and one disadvantage. There is no perfect thing.
燃?xì)廨啓C(jī)進(jìn)氣壓力比較大,越是發(fā)電效率高的機(jī)組燃料進(jìn)氣壓力越高,因為焦化煤氣本身沒有什么壓力,這就需要使用燃?xì)鈮嚎s機(jī),壓縮燃?xì)庑枰拇罅康哪芰浚绊懙皆O(shè)備的實際輸出功率,一些項目甚至需要消耗燃?xì)廨啓C(jī)15%~20%的功率,對于聯(lián)合循環(huán)項目達(dá)到影響可能是10%~15%的輸出功率;采用聯(lián)合循環(huán)系統(tǒng)存在與蒸汽輪機(jī)相同的水資源條件要求,系統(tǒng)比較復(fù)雜,投資也比較大,同時搬遷也比較困難。
The inlet pressure of gas turbine is relatively large, and the higher the unit with high power generation efficiency, the higher the fuel inlet pressure. Because coking gas itself has no pressure, it needs to use gas compressor. Compressing gas needs to consume a lot of energy, which affects the actual output power of the equipment. Some projects even need to consume 15% ~ 20% of the power of the gas turbine, which has an impact on the combined cycle project The impact may be 10% - 15% of the output power; the combined cycle system has the same water resource requirements as the steam turbine, which is more complex, more investment, and more difficult to relocate.
關(guān)于焦化發(fā)電機(jī)組http://www.51credits.cn就先介紹到這里了,相信大家在實際的工作中會用到相關(guān)知識,如果您有這方面的需要,歡迎前來選購。
About coking generator set http://www.51credits.cn First of all, I believe that you will use the relevant knowledge in the actual work, if you have the need in this respect, welcome to buy.
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

燃?xì)廨啓C(jī)與燃?xì)獍l(fā)電機(jī)組的對比

燃?xì)鈨?nèi)燃機(jī)的發(fā)電效率通常在30%-40%之間,比較常見的機(jī)型一般可以達(dá)到35%。燃?xì)鈨?nèi)燃機(jī)更突出的優(yōu)點正是發(fā)電效率比較高,其次是設(shè)備集成度高,安裝快捷,對于氣體中的粉塵要求不高,基本不需要水,設(shè)備的單位千瓦造價也比較低。但是內(nèi)燃機(jī)也有一些不足的地方,首先,內(nèi)燃機(jī)燃燒低熱值燃料時,機(jī)組出力明顯下降,一臺燃燒低熱值8000大卡/立方米天然氣燃料的500千瓦級燃?xì)鈨?nèi)燃發(fā)電機(jī)組,在使用低熱值4000大卡/立方米的焦化煤氣時,出力可能下降到350~400kW左右。
The power generation efficiency of gas-fired internal combustion engine is usually between 30% and 40%, and the more common models can reach 35%. The most prominent advantage of gas-fired internal combustion engine is high power generation efficiency, followed by high equipment integration, fast installation, low requirements for dust in gas, basically no water, and the unit kilowatt cost of the equipment is relatively low. However, the internal combustion engine also has some shortcomings. First of all, when the internal combustion engine burns low calorific value fuel, the unit output drops obviously. A 500 kW gas-fired internal combustion generator set burning 8000 kcal / m3 natural gas fuel with low calorific value may drop to 350-400kw when using coking gas with low calorific value of 4000 kcal / m3.
此外,內(nèi)燃機(jī)需要頻繁更換機(jī)油和火花塞,消耗材料比較大,也影響到設(shè)備的可用性和可靠性兩個主要設(shè)備利用指標(biāo),對設(shè)備利用率影響比較大,有時不得不采取增加發(fā)電機(jī)組臺數(shù)的辦法,來消除利用率低的影響。內(nèi)燃機(jī)設(shè)備對焦化煤氣中的水分子含量和硫化氫比較敏感,可能導(dǎo)致硫化氫和水形成硫酸腐蝕問題,需要采取一些必要措施加以克服。
In addition, the internal combustion engine needs to change the engine oil and spark plug frequently, and the consumption of materials is relatively large, which also affects the availability and reliability of the two main equipment utilization indexes, and has a greater impact on the equipment utilization rate. Sometimes, it is necessary to increase the number of generating units to eliminate the impact of low utilization rate. Internal combustion engine equipment is sensitive to water molecular content and hydrogen sulfide in coking gas, which may lead to sulfuric acid corrosion of hydrogen sulfide and water, and some necessary measures should be taken to overcome it.
焦化發(fā)電機(jī)組
燃?xì)廨啓C(jī)比較適用于高含氫低熱值和氣體含雜質(zhì)較多的劣質(zhì)燃料,一些燃?xì)廨啓C(jī)甚至使用原油和高硫渣油燃料。燃?xì)廨啓C(jī)自身的發(fā)電效率不算很高,一般在30%~35%之間,但是產(chǎn)生的廢熱煙氣溫度高達(dá)450~550℃,可以通過余熱鍋爐再次回收熱能轉(zhuǎn)換蒸汽,驅(qū)動蒸汽輪機(jī)再發(fā)一次電,形成燃?xì)廨啓C(jī)--蒸汽輪機(jī)聯(lián)合循環(huán)發(fā)電,發(fā)電效率可以達(dá)到45%~50%,一些大型機(jī)組甚至可以超過55%。
Gas turbine is more suitable for the inferior fuel with high hydrogen content and low calorific value and gas containing more impurities. Some gas turbines even use crude oil and high sulfur residue fuel. The power generation efficiency of gas turbine itself is not very high, generally between 30% and 35%, but the temperature of waste heat flue gas generated is as high as 450 ~ 550 ℃, which can be recycled by waste heat boiler to convert steam, drive steam turbine to generate electricity again, and form gas turbine steam turbine combined cycle power generation. The power generation efficiency can reach 45% ~ 50%, and some large units can even exceed 55% 。
采用燃?xì)廨啓C(jī)的優(yōu)勢相對比較多,首先是設(shè)備的可用性和可靠性都比較高,綜合利用率一般可以保持在90%;其次,對于燃料的適應(yīng)性比較強(qiáng),含硫、含塵高一點問題都不大;再有就是發(fā)電出力一般不會減少,甚至因為燃料進(jìn)氣量增加而有所增加;此外,燃?xì)廨啓C(jī)功率密度大體積小,比較適合再移動,便于轉(zhuǎn)移運行現(xiàn)場,這對于存在一些不確定性的焦化廠項目的焦化煤氣利用非常有利。但是,世上的事務(wù)有一利,必有一弊,沒有十全十美的事情。
The advantages of using gas turbine are relatively more. Firstly, the availability and reliability of the equipment are relatively high, and the comprehensive utilization rate can generally be maintained at 90%; secondly, the adaptability of fuel is relatively strong, and the problems of high sulfur content and dust content are not obvious; thirdly, the power generation output will not decrease in general, even increased due to the increase of fuel intake; In addition, the gas turbine has large power density and small volume, which is suitable for re moving and easy to transfer the operation site, which is very beneficial to the utilization of coking gas in coking plant projects with some uncertainties. However, the affairs of the world have one advantage and one disadvantage. There is no perfect thing.
燃?xì)廨啓C(jī)進(jìn)氣壓力比較大,越是發(fā)電效率高的機(jī)組燃料進(jìn)氣壓力越高,因為焦化煤氣本身沒有什么壓力,這就需要使用燃?xì)鈮嚎s機(jī),壓縮燃?xì)庑枰拇罅康哪芰?,影響到設(shè)備的實際輸出功率,一些項目甚至需要消耗燃?xì)廨啓C(jī)15%~20%的功率,對于聯(lián)合循環(huán)項目達(dá)到影響可能是10%~15%的輸出功率;采用聯(lián)合循環(huán)系統(tǒng)存在與蒸汽輪機(jī)相同的水資源條件要求,系統(tǒng)比較復(fù)雜,投資也比較大,同時搬遷也比較困難。
The inlet pressure of gas turbine is relatively large, and the higher the unit with high power generation efficiency, the higher the fuel inlet pressure. Because coking gas itself has no pressure, it needs to use gas compressor. Compressing gas needs to consume a lot of energy, which affects the actual output power of the equipment. Some projects even need to consume 15% ~ 20% of the power of the gas turbine, which has an impact on the combined cycle project The impact may be 10% - 15% of the output power; the combined cycle system has the same water resource requirements as the steam turbine, which is more complex, more investment, and more difficult to relocate.
關(guān)于焦化發(fā)電機(jī)組http://www.51credits.cn就先介紹到這里了,相信大家在實際的工作中會用到相關(guān)知識,如果您有這方面的需要,歡迎前來選購。
About coking generator set http://www.51credits.cn First of all, I believe that you will use the relevant knowledge in the actual work, if you have the need in this respect, welcome to buy.
青青草视频网| 国产精选h网站| 亚洲 一区 美| 亚洲高清久久| 日韩欧美网页| 国产91美女| 好吊色欧美一区二区三区在线观看| 性欧美激情久久久| 免费无码视频| 黄色片黄色片| 亚洲综合色一区| 晋中市| 欧美综合色婷婷| 强壮公弄得我次次高潮HD| 天天摸天天摸| 一区二区三区内射美女毛片| 成人蜜桃久久| 涩 a v| 最新天堂| 小草影院| 97国语版超碰| 在线一区视频| 国产BBww| 97色伦合视频在线| 精品无码日韩一区二区三区18| 欧美色aⅴ欧美综合色| 91精品夜夜夜一区二区| 极品少妇高潮喷水| 日韩亚洲天堂| 欧洲亚洲综合| 亚洲野国产| 国产麻豆精品一区二区三区| 亚洲中文字幕激情五月欧美日韩 | 日韩人妻少妇自拍| 国内稀有盗摄偷窥盗摄| 亚洲av杨幂性猛交xxx| 曰韩欧美一区2区3区| 久久福利中文字幕一区二区的| 国产精品厕所| 亚洲欧美精品午睡沙发| 男女xxx|